Saturday Growth

Saturday 16 March 2019 | general

The day began with a bit of unusual work: pulling old wiring out of the attic. At first, the plan was just to remove them from the area over the old carport. But when in the afternoon I began the second part of today’s tasks — adding insulation to the lower part of the house — I realized I could pull almost all the wiring out — just about the whole length of the house. It was a relic from the past: old 10-gauge wiring used for long-removed baseboard heaters.

We took a break around lunchtime for E’s first game of the season. Emil had his first break of the spring season in the second quarter. (Youth soccer is divided into quarters.) He beat the last defender, sent his shot past the goalie toward the far corner, and would have made a goal but for a few inches.

Afterward, it was back into the attic for me. In the end, I put in several bags of insulation and took out one full contractor back of wiring.

0 Comments