The first day of spring break, and I spent the morning in the attic, putting additional insulation to compensate for the fact that the insulation we blew in eleven years ago has settled significantly: all the rafters, once hidden beneath several inches of insulation were once again visible.
This time, though, I decided simply to buy some R19 batts and hope for a little longer break than eleven years before I need to do it again. Part of this is due to the fact that to get to the attic above the upper part of the house, we have to take everything — absolutely everything — out of L’s closet. That in itself will be a task. Today, though, I just focused on the lower part of the house.
While all that went on, our regular construction guys worked on our new windows in the basement and the siding for the closed-in bedroom/bathroom we’re building for Nana and Papa.
Additionally, two other fellows came in to start putting up the drywall and eventually finish the bathroom.
During all of this, the kids took care of themselves. The Boy spent the day playing with neighborhood kids, an activity that included me at least once saying, “Where’s E?” and having to go look for him. He was right where I thought he would be, but we’ll to establish some new protocols with him now that his independence is steadily increasing.
0 Comments